Cities keep expanding, and so do their subway lines. To link two underground sections, engineers use a method called "artificial ground freezing." Imagine turning the soil into a temporary ice block, making it more stable and resistant to underground water. The process starts with drilling pipes, then cooling them with a refrigerant fluid. Once the ground solidifies, the tunnel is excavated and structural supports are installed.
But it's not all smooth sailing. Cold, mechanical stress, and water interact in complex ways, creating risks like pipe fractures or leaks from the "frozen curtain." To assess these dangers, researchers built a Bayesian network, a statistical model that updates risk probabilities in real time using monitoring data. They also applied the Analytic Hierarchy Process (AHP) to weight the various factors: the excavation and support stage accounts for 53% of the risk, while thawing with grout injection adds 31%. The outcome? An overall risk probability of 46.3%, with the excavation phase being the most critical. These insights let managers act quickly, cutting down accidents and delays. In short, the science of freezing becomes a safety guard for our future subways.
